3. Results

Results


The results of our experiment are as shown below:


Table 1: Table of weight of the bridge against the amount of load hold before it collapsed against the efficiency rate


design
Weight of the bridge
(A)
Amount of load hold, before collapsing (B)
Efficiency rate
( B/A) [2 d.p)
1
309.29g
0kg
0
2
336.15g
40kg
118.99
3
258.98g
40kg
154.45
4
224.83g
40kg
177.91
5
198.24g
50kg
252.22


Videos for the destruction and testing of our bridges:
Bridge 1:
Bridge 2:
Bridge 3:
Bridge 4:
Bridge 5: